← Back to News & stories News

The final phase of the roadworks

4 September 2026

After a long stretch of construction, the end of the redesign of the Rozengracht, one of the main shopping streets in Amsterdam's Jordaan district, is coming into view. The street is slowly getting its new face back, and the new bridge over the Lijnbaansgracht is taking shape as well.

At the end of 2026 comes an important moment: two thirds of the new bridge will open to traffic heading out of the city. At the same time, the redesign of the street itself will be entirely finished.

That does not mean all the work is done. In March 2027 the tram starts running again, and in the autumn of 2027 the final section of the new bridge will be completed. So a little more patience is needed.

But the moment is getting closer when the fences and diversions can be left behind and the street can be fully itself again. We are looking forward to it.

More news